2 thoughts on “Float replacement underway

  1. There some horizontal protective wires missing from the rail along the Steveston boardwalk at the top of the gangway to the crab floating restaurant such that a child can fall through into the water

    1. Thank you for brining this to our attention.
      Repairs have been completed.

Leave a Reply to Mitch TaylorCancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.